
TSMC isn't super-confident about foundry demand in 1H 2019 but claims its 5nm ramp is fully on-track.
The post TSMC: Weak 2019 Demand, but 5nm Set for 2020 Volume Manufacturing appeared first on ExtremeTech.
from ExtremeTechExtremeTech https://www.extremetech.com/computing/284456-tsmc-weak-2019-demand-but-5nm-set-for-2020-volume-manufacturing
No comments:
Post a Comment